Conway Field Shelter House & Emerson Park Shelter House / Concession Stand
1. Conway Field Shelter House: Exterior building improvements include painting of the existing shelter, replacement of existing exterior light fixtures with new, replacement of existing gutters & downspouts with new. Additional exterior improvements include replacement of existing exterior doors, door hardware and repair to existing door frames. Replacement of existing playground safety surface material. Interior improvements include the addition of ADA compliant grab bars at ADA toilet stalls and the replacement of missing urinal partitions in the men’s toilet room. Mechanical upgrades include improved ventilation within the toilet rooms, replacement of existing light fixtures and replacement of existing water heaters. 2. Emerson Park Shelter House: Exterior building improvements include the replacement of existing light fixtures, replacement of existing entry door & hardware along with reapplication of exterior paint to the shelter house. Interior improvements include improvements to the existing unit heater. Interior painting of the shelter house and addition of non-slip resistant floor coating are also included as base bid items.
Plan Holders
Date | Company | Contact |
7/2/19 9:02 am |
Construction Exchange of Buffalo & WNY
2660 William Street Buffalo, NY 14227 |
Kristie Gerace
Plan Room Director
Tel: 7168743435
Fax: 716-875-4412
|
7/2/19 9:03 am |
Integrated Construction Services and Solutions, Inc.
434 Delaware Ave Buffalo, NY 14202 |
Karen Jerge
Owner/ President
Tel: 716 322-5858
Fax: 716 331 3811
|
7/2/19 9:43 am |
Sicoli Construction Services
4800 Hyde Park Blvd. Niagara Falls, NY 14305 |
Karianne Hehir
Office Administrator
Tel: 716-205-0540
Fax: 716-205-0541
|
7/2/19 9:04 am |
Ultima Mechanical
115 Greene st Buffalo, NY 14206 |
Jason Drzymala
Estimator
Tel: 7162285107
|
7/2/19 9:03 am |
Willett Builders Inc.
180 Genesee Street Corfu, NY 14036 |
Steve Walentynowicz
Tel: 585-599-7001
|