Phase 1 Streetscape Green Infrastructure Improvements

Installation of green infrastructure practices, including bio-retention areas and tree pits in the City of Lockport along Washburn Street between Walnut Street and South Street; South Street between Washburn Street and Locust Streets; and Pine Street between South Street and the Erie Canal Bridge.
00 Full Set Spec (click to expand/collapse)
Name Size
Full Set Spec 25.7 MB