Phase 1 Streetscape Green Infrastructure Improvements

Installation of green infrastructure practices, including bio-retention areas and tree pits in the City of Lockport along Washburn Street between Walnut Street and South Street; South Street between Washburn Street and Locust Streets; and Pine Street between South Street and the Erie Canal Bridge.
Addendum 01 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum 1 847.7 KB