Phase 1 Streetscape Green Infrastructure Improvements
Installation of green infrastructure practices, including bio-retention areas and tree pits in the City of Lockport along Washburn Street between Walnut Street and South Street; South Street between Washburn Street and Locust Streets; and Pine Street between South Street and the Erie Canal Bridge.
Addendum 01
(click to expand/collapse)
Name | Size | ||
Addendum 1 | 847.7 KB |